Tucson, AZ
SWPPP Services

…and in Casas Adobes, Catalina Foothills, Marana

Simple up front pricing

72 hour turnaround time

No-Risk 100% Satisfaction Guaranteed

“Arizona

Getting started is easy

1

Select your desired service

or contact us to schedule a consultation regarding your project

2

Fill out the project information form and upload your plans

After submitting your order, you’ll receive an email to upload your plans

3

48 to 72 hours later, you’ll receive your SWPPP

Need it faster? Please contact us; we’re here to help you get your project started.

Have a project in Tucson?

Our Tucson SWPPP services are designed to help get your project started and ensure compliance with state and City of Tucson regulations. We offer a range of services, including Notice of Intent preparation, erosion and sediment control plan design, stabilization plans, and SWPPP signage.

What is a SWPPP?

A Stormwater Pollution Prevention Plan, also known as a SWPPP, SWP3, or SW3P, is a site-specific document that identifies:

  • The scope of the project.
  • The operator(s) who are responsible for implementing the Stormwater Pollution Prevention Plan.
  • Potential sources of stormwater pollution at the construction site.
  • The measures that will be implemented to contain on-site pollutants and prevent them from being carried off-site in the form of runoff during storms.

Who is required to have a SWPPP?

Any construction site that disturbs one or more acres, or is part of a Common Plan of Development must develop a SWPPP and obtain permit coverage under the Arizona Department of Environmental Quality (ADEQ) Construction General Permit No. AZG2025-001. The SWPPP is one of several documents required as part of the development package submitted to the City of Tucson.

Unsure what jurisdiction your property falls within? Use the City of Tucson Jurisdiction Web Map


Stormwater Pollution Prevention Plan

For AZG2025-001 Projects

$799

Includes

Prepared ADEQ Notice of Intent application


Prepared Site Notices


Submittals to local MS4 regulator to start and end project


72 hour turnaround time


ADEQ Notice of Intent

Prepared permit application

$99

Ideal for

Projects that have a SWPPP but need their ADEQ Notice of Intent

Includes

Prepared Construction Site Notices


Submittals to local MS4 regulator to start and end project


48 hour turnaround time


Need a custom solution for your project?

Call 1-888-363-0022

Ideal for

Developers and home builders with multiple projects


Multi-phased developments

Stormwater Pollution Prevention Plan

For AZG2025-001 Projects

ADEQ Notice of Intent

Prepared permit application

Need a custom solution for your project?

$799
$99

Call 1-888-363-0022

Includes

Prepared ADEQ Notice of Intent application

Ideal for

Projects that have a SWPPP but need their ADEQ Notice of Intent

Ideal for

Developers and home builders with multiple projects


Prepared Construction Site Notices


Submittals to local MS4 regulator to start and end project


72 hour turnaround time


Includes 

Prepared Construction Site Notices


Submittals to local MS4 regulator to start and end project


48 hour turnaround time


and 

Multi-phased developments

Frequently Asked Questions

How do I get my project started in Tucson?
  • 1. Develop a Stormwater Pollution Prevention Plan (SWPPP)
  • 2. Submit your Notice of Intent to the Arizona Department of Environmental Quality (ADEQ) through the MyDEQ Portal.
  • 3. Submit your SWPPP to the City of Tucson Planning and Development Services Department (PDSD)
  • 4. Implement your SWPPP by installing the proposed erosion and sediment control plan and posting all required notices
  • 5. Conduct the required inspections and perform maintenance on any deficiency items found during the inspections

What is a “Common Plan of Development”?
A construction activity is part of a larger common plan of development if it is completed in one or more of the following ways:
  • in separate stages
  • in separate phases
  • in combination with other construction activities
It is identified by the documentation that identifies the scope of the project including such things as the following:
  • plats
  • blueprints
  • marketing plans
  • contracts
  • building permits
  • public notice or hearing
  • zoning requests

It can include one operator or many operators.

Example: A subdivision is being developed. A home builder is constructing a house on a 0.5-acre lot, another company is clearing 2 acres in the next phase of the subdivision, and a contractor is excavating an additional 0.5 acres for a pond. In this case, the total disturbed area would be 3 acres, so each operator would be subject to the requirements associated with disturbing 1 or more acres.


What construction activities require a SWPPP and Permit Coverage?

“Construction” refers to actions that result in a disturbance of the land, including clearing, grading, excavating, and other similar activities.

It also includes “construction-related activities,” areas that support the construction project such as stockpiles, borrow areas, concrete truck washouts, fueling areas, material storage areas and equipment storage areas. Construction activities that do not disturb land, such as interior remodeling, generally do not require permit coverage.