Carson City
SWPPP Services
…and in Carson Valley, Silver Oak, Lakeview
Simple up front pricing
72 hour turnaround time
No-Risk 100% Satisfaction Guaranteed
Getting started is easy
2
Fill out the project information form and upload your plans
After submitting your order, you’ll receive an email to upload your plans
3
48 to 72 hours later, you’ll receive your SWPPP
Need it faster? Please contact us; we’re here to help you get your project started.
Have a project in Carson City?
Our Carson City SWPPP services are designed to help get your project started and ensure compliance with state and local regulations under the City of Carson City. We offer a range of services, including Notice of Intent preparation, erosion and sediment control plan design, stabilization plans, and SWPPP signage.
What is a SWPPP?
A Stormwater Pollution Prevention Plan, also known as a SWPPP, SWP3, or SW3P, is a site-specific document that identifies:
- – The scope of the project.
- – The operator(s) who are responsible for implementing the Stormwater Pollution Prevention Plan.
- – Potential sources of stormwater pollution at the construction site.
- – The measures that will be implemented to contain on-site pollutants and prevent them from being carried off-site in the form of runoff during storms.
Who is required to have a SWPPP?
Any construction site that disturbs one or more acres, or is part of a Common Plan of Development must develop a Stormwater Pollution Prevention Plan (SWPPP) and obtain permit coverage under the Nevada Division of Environmental Protection (NDEP) Construction General Permit No. NVR100000. The SWPPP is one of several documents required as part of the development package submitted to the City of Carson City. Additional information about SWPPP requirements in Carson City can be found in the Carson City Development Standards, Division 13: Erosion and Sediment Control.
Unsure what jurisdiction your property falls within? Use the Carson City Interactive Jurisdiction Map
Stormwater Pollution Prevention Plan
For NVR100000 Projects
$799
Includes
Prepared NDEP Notice of Intent application
Prepared Site Notices
Submittals to local MS4 regulator to start and end project
72 hour turnaround time
NDEP Notice of Intent
Prepared permit application
$99
Ideal for
Projects that have a SWPPP but need their NDEP Notice of Intent
Includes
Prepared Construction Site Notices
Submittals to local MS4 regulator to start and end project
48 hour turnaround time
Need a custom solution for your project?
Call 1-888-363-0022
Ideal for
Developers and home builders with multiple projects
Multi-phased developments
Stormwater Pollution Prevention Plan
For NVR100000 Projects
NDEP Notice of Intent
Prepared permit application
Need a custom solution for your project?
$799
$99
Call 1-888-363-0022
Includes
Prepared NDEP Notice of Intent application
Ideal for
Projects that have a SWPPP but need their NDEP Notice of Intent
Ideal for
Developers and home builders with multiple projects
Prepared Construction Site Notices
Submittals to local MS4 regulator to start and end project
72 hour turnaround time
Includes
Prepared Construction Site Notices
Submittals to local MS4 regulator to start and end project
48 hour turnaround time
and
Multi-phased developments
Frequently Asked Questions
- 1. Develop a Stormwater Pollution Prevention Plan (SWPPP)
- 2. Submit your Notice of Intent to the Nevada Division of Environmental Protection (NDEP) through the Water Pollution Control General Permit System.
- 3. Submit your SWPPP to the City of Carson City Development Engineering Division as part of your development submittal package
- 4. Implement your SWPPP by installing the proposed erosion and sediment control plan and posting all required notices
- 5. Conduct the required inspections and perform maintenance on any deficiency items found during the inspections
How can Smart SWPPP help?
We have a streamlined approach to getting your SWPPP and Notice of Intent developed and submitted to the local regulator within 72 hours. Let us help you save time and money on your next project.
- – in separate stages
- – in separate phases
- – in combination with other construction activities
- – plats
- – blueprints
- – marketing plans
- – contracts
- – building permits
- – public notice or hearing
- – zoning requests
It can include one operator or many operators.
Example: A subdivision is being developed. You are building homes on 0.5 acres, another company is clearing 2 acres in the next phase, and a contractor is excavating another 0.5 acres for a pond. In this case, the total area that would be disturbed is 3 acres, so each operator would fall under the requirements associated with disturbing 1 or more acres.
“Construction” refers to actions that result in a disturbance of the land, including clearing, grading, excavating, and other similar activities.
It also includes “construction-related activities,” areas that support the construction project such as stockpiles, borrow areas, concrete truck washouts, fueling areas, material storage areas and equipment storage areas. Construction activities that do not disturb land, such as interior remodeling, generally do not require NPDES permit coverage.